Global Switch Technical Specification London South English

LONDON SOUTH

Location – The data centre is located 0.5 miles from the financial district and 3.5 miles from the city centre – A local metro station (DLR) is located within a 5 minute walk – London City Airport is 3.5 miles away and Heathrow, Gatwick and Stansted are within driving distance Building Overview – G lobal Switch owns the freehold – Purpose built – E xceeds Tier III operational performance – 2 7,000 sq m of gross space – 5 data floors – Flexible IT space with ability to create bespoke environments as required Main Structural Features – S teel frame with concrete floors, metal faced cladding and glazing – 6 m slab to slab height – N o raised floor – M inimum from finished floor: 4m clear height to underside of false ceiling – Floor loading of 15kN/m² – 2 goods lifts (7 tonnes), 2 passenger lifts Power – 132kV utility supply with N+N redundancy – U tility power supply capacity of 40MVA (planned) – Technical (IT) power supplied by on-site static N+1 UPS per floor – M echanical systems backed up by standby generator system with N+1 redundancy – Fully diverse power distribution to technical areas – O n-site fuel storage to support 24 hours at full capacity with 24x7x365 fuel delivery – Offering 3,000 W/m 2 as standard

Cooling – 38MW of installed cooling provision – M inimum N+1 resilience on all systems – Fan-Wall units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9 – D iverse distribution pipework throughout – C hilled water cooling system Security – S ecurity Operations Centre manned 24x7x365 – S ecurity guard patrols 24x7x365 – C ontinuous CCTV surveillance of external and internal areas – C CTV records kept for 90 days – C omprehensive intruder detection and alarms to all areas – P erimeter Intrusion Detection system (PIDs) – S trict access control procedures to ISO 27001 and PCI:DSS – A ccess control using proximity card readers – P hysical access via mantrap – S ecure managed delivery and loading area available 24x7x365 Connectivity – C arrier and cloud neutral – N etwork dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice and Mobile Services – A ccess to multiple cloud services through leading public, private and hybrid cloud solution providers – 2 dedicated Meet Me Rooms – 2 diverse building entry points – D iverse cable routes and pathways – C ampus fibre system interconnecting London South, London East and London North – M ultiple LINX Fibre/Capacity Partners and remote peering service providers

Fire Detection and Suppression – Fully addressable fire detection system in all areas – A spirated early warning smoke detection system (monitored 24x7x365) – P re-action watermist system in technical areas and sensitive plant spaces Critical Environments Management – E xperienced 24x7x365 facilities management team – E nvironment (thermal conditions) monitored 24x7x365 – A ll Building Management Systems (BMS) monitored 24x7x365 – C omprehensive energy metering system – Internationally recognised critical environments programme

Other Services – Cross connects – Customer reports – D eliveries and storage – D esign and build – Fit out – On-site facilities – Remote hands – Technical cleaning – Waste disposal

Certifications – ISO 9001, 14001, 27001, 45001, 50001 – PCI DSS Compliant – M embership of the United Kingdom Climate Change Agreement (CCA) Technical specification, which is subject to change, relates to the completion of all stages of Global Switch London South

Global Switch London South Nutmeg Lane London E14 2AX United Kingdom +44 20 7473 9000 saleslondon@globalswitch.com

Powered by