Global Switch Technical Specification Amsterdam West

AMSTERDAM WEST

Location – The data centre is located 2km from the financial district and city centre – A local Metro station is immediately outside the main gate – S chiphol International Airport is 10 minutes away by car Building Overview – G lobal Switch has a long term ground lease with automatic renewal rights – Purpose built – E xceeds Tier III operational performance – 41,061 sq m of gross space – 1 data floor – Flexible IT space with ability to create bespoke environments as required Main Structural Features – R einforced concrete frame with reinforced concrete floors, metal faced cladding and glazing – 3 .75m slab to slab height – R aised floor height of 750mm – M inimum from raised floor: 3m clear height to underside of deepest beam – Floor loading of 10kN/m 2 for technical areas, and higher for plant equipment areas – 1 goods lift (5 tonnes) Power – 5 0kV utility supply – U tility power supply capacity of 32MVA (current) – Technical (IT) power supplied by on-site Diesel Rotary UPS for Hall 1 with N+1 redundancy and by 2N static UPS for Halls 2, 3 and 4 – M echanical systems backed up by standby generator system for Halls 2, 3 and 4 with N+1 redundancy – Fully diverse power distribution to technical areas – O n-site fuel storage to support 48 hours at full load with 24x7x365 fuel delivery – O ffering 1,500 W/m 2 as standard, with higher power density solutions fully supported

Cooling – 2 7.9MW of installed cooling provision – M inimum N+1 resilience on all systems – C RAH units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9 – D iverse distribution pipework throughout – C hilled water cooling system Security – O perations Centre manned 24x7x365 – S ecurity guard patrols 24x7x365 – C ontinuous CCTV surveillance of external and internal areas – C CTV records kept for 31 days – C omprehensive intruder detection and alarms to all areas – P erimeter Intrusion Detection system (PIDs) – S trict access control procedures to ISO 27001 – A ccess control using proximity card readers and biometric systems – P hysical access via mantrap – S ecure managed delivery and loading area available 24x7x365

Fire Detection and Suppression – A nalogue addressable fire detection system in all areas – A spirated early warning smoke detection system (monitored 24x7x365) – Inergen gas suppression system in technical areas Critical Environments Management – E xperienced 24x7x365 facilities management team – Environment (thermal conditions) monitored 24x7x365 – A ll Building Management Systems (BMS) monitored 24x7x365 – C omprehensive energy metering systems – Internationally recognised critical environments programme

Other Services – Cross connects – Customer reports – D eliveries and storage – D esign and build – Fit-out – On-site facilities – Remote hands – Technical cleaning – Waste disposal

Connectivity – C arrier and cloud neutral

– N etwork dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice and Mobile Services – A ccess to multiple cloud services through leading public, private and hybrid cloud solution providers – 3 diverse MMRs servicing the campus – 3 diverse Building Entry Points servicing the campus – D iverse cable routes and pathways – R oof space availability for satellite and antennae equipment – A MS-IX, NL-IX, GE-CIX, NetIX Communications and Speed-IX present

Certifications – ISO 9001, 14001, 27001, 45001, 50001 – ISAE 3402 – AMS-IX – PCI DSS Compliant Global Switch Amsterdam West Johan Huizingalaan 759 1066 VH Amsterdam Netherlands +31 20 6666 300 salesamsterdam@globalswitch.com

Powered by