Location – The data centre is located close to the Hong Kong Stock Exchange hosting facility and Hong Kong’s Central Business Districts – The local railway station (MTR, Mass Transit Railway) Lohas Park is located within a short walk, with taxi and bus access – C hek Lap Kok International Airport is 50 minutes away by car Building Overview – G lobal Switch has a long term lease with renewal rights over the land – Purpose built – E xceeds Tier III operational performance – 70,545 sq m of gross space – 5 buildings – Flexible IT space with ability to create bespoke environments as required

Cooling – 82MW installed and planned cooling provision – M inimum N+1 resilience on all systems – C RAH units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9 – D iverse distribution pipework throughout – C hilled water cooling system Security – O perations Centre manned 24x7x365 – S ecurity guard patrols 24x7x365 – C ontinuous CCTV surveillance of external and internal areas – C CTV records kept for 31 days – C omprehensive intruder detection and alarms to all areas – P erimeter Intrusion Detection system (PIDs) – S trict access control procedures to ISO 27001 – A ccess control using proximity card readers and biometric systems – P hysical access via mantrap – S ecure managed delivery and loading area available 24x7x365

Fire Detection and Suppression – D igital addressable fire detection system in all areas – A spirated early warning smoke detection system (monitored 24x7x365) – Inergen gas suppression system in technical areas with dry pipe pre-action sprinkler system for additional resiliency Critical Environments Management – E xperienced 24x7x365 facilities management team – Environment (thermal conditions) monitored 24x7x365 – A ll Building Management Systems (BMS) monitored 24x7x365 – C omprehensive energy metering systems – Internationally recognised critical environments programme

Main Structural Features – C oncrete structure with metal faced

Other Services – Cloud services – Colocation – Cross connects – Customer reports – Data storage – D eliveries and storage – D esign and build – D istributed Denial of Service attack (DDoS) Service – Fit-out – Managed connectivity – Network security – Remote hands – Technical cleaning – Waste disposal

cladding and glazing – 6 m slab to slab height – R aised floor height of 900mm – M inimum from raised floor: 4.3m clear height to underside of deepest beam – Floor loading of 12kN/m² – 2 goods lift (5 tonnes), 7 passenger lifts Data Centre Services Power – 132kV utility supply with N+1 redundancy – U tility power supply capacity of 100MVA (current) – Technical (IT) power and mechanical systems supplied by on-site Diesel Rotary UPS with N+2 redundancy for Buildings 1-3 and by on site static UPS with N+1 redundancy for Buildings 4-5 – M echanical systems backed up by standby generator system with N+1 redundancy for Buildings 4-5 – Fully diverse power distribution to technical areas – O n-site fuel storage to support 24 hours at full capacity with 24x7x365 fuel delivery – O ffering 2,000 W/m 2 as standard, with higher power density solutions fully supported

Connectivity – C arrier and cloud neutral

– N etwork dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice and Mobile Services – A ccess to multiple cloud services through leading public, private and hybrid cloud solution providers

– 2 dedicated Meet Me Rooms – 3 diverse building entry points

Certifications – ISO 9001, 14001, 27001, 45001, 50001

– D iverse cable routes and pathways – R oof space availability for satellite and antennae equipment