Global Switch Technical Specification Singapore Tai Seng

SINGAPORE TAI SENG

Location – The data centre is located 9km from the financial district and the city centre – A MRT station is located within a 10 minute walk, bus access is readily available – C hangi Airport is 15km away Building Overview – G lobal Switch has a long term lease with renewal rights for a further 30 years – Purpose built – E xceeds Tier III operational performance – 2 6,743 sq m of gross space – 7 data floors – Flexible IT space with ability to create bespoke environments as required Main Structural Features – S teel frame with reinforced concrete floors, metal faced cladding and glazing – 4 .1m typical slab to slab height – R aised floor height of 600mm – M inimum from raised floor: typical 3m clear height to underside of deepest beam – Floor loading of 7.5kN/m² – 2 goods lifts (3.5 tonnes), 2 passenger lifts Power – 2 2kV utility supply with N+N redundancy – U tility power supply capacity of 30MVA (current and planned) – Technical (IT) power supplied by on-site 2N static UPS in the Main Building and by Diesel Rotary UPS with N+1 redundancy in the Extension Wing – M echanical systems supported by diesel backup generator system in the Main Building with N+1 redundancy – Fully diverse power distribution to technical areas – O n-site fuel storage to support 24 hours at full capacity with 24x7x365 fuel delivery – O ffering 1,000 W/m 2 as standard, with higher power density solutions fully supported

Cooling – 3 0MW of installed cooling provision – M inimum N+1 resilience on all systems – C RAC units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9 – D iverse distribution pipework throughout – C ondenser water and chilled water based cooling systems Security – O perations Centre manned 24x7x365 – S ecurity guard patrols 24x7x365 – C ontinuous CCTV surveillance of external and internal areas – C CTV records kept for 90 days – C omprehensive intruder detection and alarms to all areas – S trict access control procedures to ISO 27001 – A ccess control using proximity card readers – P hysical access via mantrap – S ecure managed delivery and loading area available 24x7x365 – C ompliant with Monetary Authority of Singapore’s (MAS) TVRA requirements

Fire Detection and Suppression – Fully addressable fire detection system in all areas – A spirated early warning smoke detection system (monitored 24x7x365) – D ry pipe pre-action sprinkler system and Inergen gas suppression system in technical areas Critical Environments Management – E xperienced 24x7x365 facilities management team – Environment (thermal conditions) monitored 24x7x365 – A ll Building Management Systems (BMS) monitored 24x7x365 – C omprehensive energy metering system – Internationally recognised critical environments programme

Other Services – Cross connects – Customer reports – D eliveries and storage – D esign and build – Fit-out – On-site facilities – Remote hands – Technical cleaning – Waste disposal

Connectivity – C arrier and cloud neutral

– N etwork dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice and Mobile Services – A ccess to multiple cloud services through leading public, private and hybrid cloud solution providers

Certifications – ISO 9001, 14001, 27001, 45001, 50001

Global Switch Singapore Tai Seng 2 Tai Seng Avenue Singapore 534408 +65 6858 5008 salessingapore@globalswitch.com

– 6 dedicated Meet Me Rooms – 2 diverse building entry points

– D iverse cable routes and pathways – R oof space availability for satellite and antennae equipment – S ingapore Internet Exchange (SGIX) present – S everal submarine cables landing directly in the building

Powered by