Global Switch Technical Specification Singapore Woodlands

SINGAPORE WOODLANDS

Location – The data centre is located 17km from the Central Business District and 15km from Tai Seng – A MRT station is located within a 10 minute walk, bus access is readily available – C hangi Airport is 23km away Building Overview – G lobal Switch has a long term lease with renewal rights for a further 30 years – Purpose built – E xceeds Tier III operational performance – 2 5,157 sq m of gross space – 5 data floors – Flexible IT space with ability to create bespoke environments as required Main Structural Features – R einforced concrete frame with reinforced concrete floors, concrete walls with external metal cladding – 5 .4m slab to slab height – R aised floor height of 900mm – M inimum from raised floor: 3.5m clear height to underside of ceiling – Floor loading of 15kN/m² – 1 goods lift (5 tonnes), 3 passenger lifts Power – 22kV utility supply with N+N redundancy – U tility power supply capacity of 30MVA (current) – Technical (IT) power and mechanical systems supplied by on-site Diesel Rotary UPS with N+2 and N+1 redundancy respectively – Fully diverse power distribution to technical areas – O n-site fuel storage to support 24 hours at full capacity with 24x7x365 fuel delivery – O ffering 1,500 W/m² as standard, with higher power density solutions fully supported

Cooling – 2 8.8MW of installed cooling provision – M inimum N+1 resilience on all systems – C RAH units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9 – D iverse distribution pipework throughout – C hilled water cooling system Security – O perations Centre manned 24x7x365 – S ecurity guard patrols 24x7x365 – C ontinuous CCTV surveillance of external and internal areas – C CTV records kept for 90 days – C omprehensive intruder detection and alarms to all areas – P erimeter Intrusion Detection system (PIDs) – S trict access control procedures to ISO 27001 – A ccess control using proximity card readers and biometric systems – P hysical access via mantrap – S ecure managed delivery and loading area available 24x7x365

Fire Detection and Suppression – A nalogue addressable fire detection system in all areas – A spirated early warning smoke detection system (monitored 24x7x365) – Inert gas suppression system in technical areas with dry pipe pre-action sprinkler for additional resiliency Critical Environments Management – E xperienced 24x7x365 facilities management team – Environment (thermal conditions) monitored 24x7x365 – A ll Building Management Systems (BMS) monitored 24x7x365 – C omprehensive energy metering system – Internationally recognised critical environments programme

Other Services – Cross connects – Customer reports – D eliveries and storage – D esign and build – Fit-out – On-site facilities – Remote hands – Technical cleaning – Waste disposal

– C ompliant with Monetary Authority of Singapore’s (MAS) TVRA requirements

Connectivity – C arrier and cloud neutral – N etwork dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice and Mobile Services – A ccess to multiple cloud services through leading public, private and hybrid cloud solution providers

Certifications – ISO 9001, 14001, 27001, 45001, 50001

Global Switch Singapore Woodlands 7 Woodlands Height Singapore 737858 +65 6958 1800 salessingapore@globalswitch.com

– 2 dedicated Meet Me Rooms – 4 diverse building entry points

– D iverse cable routes and pathways – R oof space availability for satellite and antennae equipment

Powered by