Global Switch Technical Specification London North

LONDON NORTH

Location – The data centre is located 0.5 miles from the financial district and 3.5 miles from the city centre – A local metro station (DLR) is located within a 5 minute walk – London City Airport is 3.5 miles away and Heathrow, Gatwick and Stansted are within driving distance Building Overview – G lobal Switch owns the freehold – Purpose built – E xceeds Tier III operational performance – 2 3,439 sq m of gross space – 3 data floors – Flexible IT space with ability to create bespoke environments as required Main Structural Features – S teel frame with concrete floors, metal faced cladding and glazing – 5 m slab to slab height – R aised floor height of 600mm (Areas 1 and 2), 800mm (Area 3) – M inimum from raised floor: 3.8m clear height to underside of deepest beam – Floor loading of 5kN/m 2 (Areas 1 and 2), 12kN/m 2 (Area 3) – 2 goods lifts (2.5 tonnes), 2 passenger lifts Power – 11kV utility supply with N+1 redundancy – U tility power supply capacity of 26MVA (current and planned) – Technical (IT) power supplied by on-site static N+1 UPS in Area 1 and by Diesel Rotary UPS with N+1 redundancy in Areas 2 and 3 – M echanical systems backed up by standby generator system for Area 1 with N+1 redundancy – Fully diverse power distribution to technical areas – O n-site fuel storage to support 48 hours at full capacity with 24x7x365 fuel delivery – O ffering 2,000 W/m 2 as standard with higher power density solutions fully supported – A nnualised PUE of less than 1.3 in Area 3

Cooling – 16.1MW of cooling provision

Fire Detection and Suppression – A nalogue addressable fire detection system in all areas – A spirated early warning smoke detection system (monitored 24x7x365) – A rgonite and FM200 gas suppression systems in technical areas Critical Environments Management – E xperienced 24x7x365 facilities management team – Environment (thermal conditions) monitored 24x7x365 – A ll Building Management Systems (BMS) monitored 24x7x365 – C omprehensive energy metering system – Internationally recognised critical environments programme

– M inimum N+1 resilience on all systems – C RAH units control temperature and humidity in technical space within the recommended range of ASHRAE TC9.9 – D iverse distribution pipework throughout – C hilled water cooling system – In rack cooling capability if required Security – O perations Centre manned 24x7x365 – S ecurity guard patrols 24x7x365 – C ontinuous CCTV surveillance of external and internal areas – C CTV records kept for 90 days – C omprehensive intruder detection and alarms to all areas – P erimeter Intrusion Detection System (PIDs) – S trict access control procedures to ISO 27001 and PCI DSS compliant – A ccess control using proximity card readers – P hysical access via mantrap – S ecure managed delivery and loading area available 24x7x365

Other Services – Cross connects – Customer reports – D eliveries and storage – D esign and build – Fit-out – On-site facilities – Remote hands – Technical cleaning – Waste disposal

Connectivity – C arrier and cloud neutral

– N etwork dense with access to multiple global and regional carriers and Internet service providers offering Dark Fibre, Wavelength, Ethernet, MPLS, VPLS, IP Transit, Peering, CDN, Storage, Virtualised Services (SDN), Voice and Mobile Services – A ccess to multiple cloud services through leading public, private and hybrid cloud solution providers

Certifications – ISO 9001, 14001, 27001, 45001, 50001 – P CI DSS Compliant – M embership of the United Kingdom Climate Change Agreement (CCA)

– 2 dedicated Meet Me Rooms – 2 diverse building entry points

Global Switch London North East India Dock House 240 East India Dock Road London E14 9YY, United Kingdom +44 20 7473 9000 saleslondon@globalswitch.com

– D iverse cable routes and pathways – C ampus fibre system interconnecting London North and London East – R oof space availability for satellite and antennae equipment – M ultiple LINX Fibre/Capacity Partners and remote peering service providers

Powered by